
Renovation
Bathroom
in Just 7 Days!
One team, one project, one week — your bathroom fully rebuilt by professional installers.
Basic
Package
Looking for a quick and budget-friendly bathroom upgrade?
Our Basic Package delivers a clean, functional, and modern bathroom without changing the layout — completed in just 7 days.
From £3,500
Before & After Photos
Before & After Photos
This bathroom in Llanelli was fully renovated for £3,750.
Our Basic Package delivers a clean, functional, and modern bathroom without changing the layout — completed in just 7 days.
Transformation
Step-by-Step Transformation

01
Demolition
Removed old tiles, sanitaryware, and floor covering. Prepared the room for renovation.
02
Floor and Wall Preparation
Levelled the floor and walls using cement mixes, Hardiebacker boards, and gypsum panels. Reinforced with sealing tapes and membranes for a solid base.
Materials used:
• Hardiebacker 12mm board
• Gyproc Handiboard
• Floor preparation & sealing materials

Cost: £438.84 (materials + consumables)

03
Ventilation Opening & Extractor Fan
Created a wall opening for ventilation and installed an extractor fan with ducting to improve airflow and reduce humidity.
Materials used :
• Extractor fan
• PVC trim & draught strip
• Pipes, bends and connectors
Cost: £42.57 (materials)
04
Waterproofing
Applied full waterproofing treatment on walls and floor with moisture-resistant compounds, sealing tapes, and primer to ensure protection against leaks.
Materials used :
• Waterproofing membrane & coating
• Sealing tape & primer

Cost: £180 (materials)

05
Tiling Installation
Laid ceramic tiles on walls and floor, using adhesive and grout for a durable and stylish finish.
Materials used :
• Akara Imperial tiles (£32.90 /m²)
• Akara Blue tiles (£24.66 /m²)
• Tile adhesive BAL ECO Jasmine
• Grout
Cost: £438,5 (materials)
05
Sanitaryware Installation
Installed new modern sanitaryware, ensuring reliable plumbing connections and a clean, functional finish.
Materials used:
• Shower enclosure – £322.95
• Shower tray panel & leg set – £61.70
• Electric towel radiator – £114.00
• Toilet + basin pack – £129.00
• Basin mixer tap (Barcelona) – £26.99
• Electric shower Triton Riba – £68.98
• Bathroom accessories – £41.23

Cost: £788.55 (materials)

Project Summary
Materials:
£1,888.46
(All purchased materials: tiles, adhesive, sanitaryware, consumables, preparation compounds, etc.)
Labour:
£1,850.00
(Full scope of works: demolition, preparation, ventilation installation, waterproofing, tiling, sanitaryware installation, finishing)
Total Project Cost:
£3,738.46
(Fixed price including all materials and labour – a complete bathroom delivered ready to use)
Our Works
Our Works
Take a look at some of the bathrooms we’ve renovated across South Wales. From quick refreshes to premium transformations — all done in just one week.

Reviews
What Our Clients Say

































